外向型塑料制品企业物控常用英语词汇
ABC分类法ABC Classification
安全库存量Safety Stock
按需订货Lot for Lot
保管费Carrying Cost
保管费率Carrying Cost Rate
保险期Safety Time
保质期shelf life
闭环物料需求计划Closed Loop MRP
标杆瞄准Benchmarking
标准产品成本Standard Product Cost
标准单位运转工时Standard Unit Run Hour
标准工资率Standard Wage Rate
标准机器设置工时Standard Set Up Hour
补足欠交Fill Backorder
不活动报告No Action Report
采购订单跟踪Purchase Order Tracking
采购订单价格Price Purchase Order
采购计划法Vendor Scheduling
采购计划员Vendor Scheduler
采购员Buyer
残料率Scrap Factor
仓库库位类型Inventory Location Type
仓位备注Location Remarks
仓位代码Location Code
#p#副标题#e#
仓位数量Quantity At Location
仓位状况Location Status
层Level
产品结构树Production Tree
产品控制Product Control
产品率Production Rate
产品线Production Line
厂际需求Interplant Demand
车间作业管理Shop Floor Control
粗能力计划Rough-cut Capacity Planning
措施信息Action Message
达到库存Available Stock
呆滞材料分析Excess Material Analysis
单位成本Unit Cost
单元式制造Cellular Manufacturing
倒冲法Back flush
倒序计划Back Scheduling
登陆标志MPS Book Flag MPS
低位码Low Level Code
调整日期Date Adjust
调整现有库存量Adjust-on-hand
订单输入Order Entry
订货备注Order Remarks
订货承诺Order Promising
#p#副标题#e#
订货点Order Point
订货方针Order Policy
独立需求Independent Demand
队列Queue
多重仓位Multiple Location
发货单Ship Order
发货单联系人Ship Contact
发货地址Ship Address
发货零件Ship Date
发货日期Date to Pull
发料单Disbursement List
发票价格Price Invoice
发送订单Issue Order
发送零件Send Part
反查Pegging
反常需求Abnormal Demand
非独立需求Dependent Demand
分库Branch Warehouse
分销资源计划Distribution Resource Planning (DRP)
负荷Load
负荷报告Load Report
负荷量Load Leveling
工厂日历Shop Calendar
工程变更生效单Engineering Change Effect Work Order
#p#副标题#e#
工程变更生效日期Engineering Change Effect Date
工程停止日期Engineering Stop Date
工时清单Bill of Labor
工艺路线Routing
工作进度安排Work Scheduling
工作令Work Order
工作令跟踪Work Order Tracking
工作中心Work Center
工作中心能力Work Center Capacity
鼓-缓冲-绳子Drum-buffer-rope
固定订货批量F ixed Order Quantity
后减库存处理法Post-deduct Inventory Transaction Processing
活动报告标志Action-report-flag
机器加载Machine Loading
机器能力Machine Capacity
基于活动的成本核算Activity-based Costing (ABC)
急送代码Expedite Code
急需零件Critical Part
集中预测Focus Forecasting
计划订单Planned Order
计划自动重排Automatic Rescheduling
计算机集成制造Computer-integrated Manufacturing (CIM)
加工车间Job Shop
加工订单Fabrication Order
检查点Check Point
检验标识Inspection ID
建议工作单Suggested Work Order
交付日期Date Released
结束日期Date Closed
截止日期Date Due
进货数量Quantity In
经济订货批量Economic Order Quantity (EOQ)
#p#副标题#e#
经营规划Business Plan
净改变式MRP N et Change MRP
净需求Net Requirements
看板Kanban
可达到库存Available Inventory
可利用工时Available Work
可签约量Available-to-promise
可用材料Available Material
空负荷Dead Load
库存调整日期Date Inventory Adjust
库存控制Stores Control
库存周转次数Inventory Turnover
库存周转率Inventory Carry Rate
累计提前期Cumulative Lead Time
例外控制Exception Control
零件Part
零件编号Part Number
零件批次Part Lot
零件清单Part Bills
零库存Zero Inventories
领料/提货Picking
领料单Picking List
毛需求Gross Requirements
毛需求量Quantity Gross
面向订单生产的产品Make-to-order Product
面向库存生产的产品Make-to-stock Product
#p#副标题#e#
能力管理Capacity Management
能力需求计划Capacity Requirements Planning (CRP)
排队时间Queue Time
派工单Dispatch List
配置代码Configuration Code
批号Batch Number
批量Lot Size
批量编号Lot Number
批量标识Lot ID
批量生产Batch Production
平均库存Average
时间段Time Bucket Inventory
前减库存处理法Pre-deduct Inventory Transaction Processing
欠交订单Back Order
欠交数量Quantity Backorder
确认的计划订单Firm Planned Order
人工工时Labor Hour
生产规划编制Production Planning
生产日期Date in Produced
时界Time Fence
实际成本Actual Costs
实际能力Actual Capacity
实际能力Demonstrated Capacity
收到日期Date Received
双亲Parent
#p#副标题#e#
损耗系数Shrinkage Factor
提货单Bill of Lading
提前期Lead Time
替代工序Alternative Routine
通用工序标识Common Route ID
通用生产管理原则Generally Accepted Manufacturing Practices
投入/产出控制Input/ Output Control
外购或自制决策Make or Buy Decision
完成数量Quantity Completion
完全跟踪Full Pegging
维修件Service Parts
未结订单Open Order
未完成订单Backlog
物料成本Material Cost
物料发送和接收Material Issues and Receipts
物料清单Bill of Material
物料项目Item
物料需求计划Material Requirements Planning (MRP)
现有库存量On-hand Balance
现有库存余额Balance-on-hand Inventory
现有运转时间Current Run Hour
现有运转数量Current Run Quantity
项目记录Item Record
#p#副标题#e#
新仓库New Warehouse
新仓位New Location
新组件New Parent
修改产品结构Change Structure
修改工序Change Route
修改批量日期Change Lot Date
修改日期Date Changed
需求Demand
需求管理Demand Management
需求量Quantity Demand
需求日期Date Required
依成本的材料清单Costed Bill of Material
已分配量Allocation
已分配量Quantity Allocation
优先计划Priority Planning
有效日期Date Available
预计可用库存Projected Available Balance
预计入库量Scheduled Receipt
约束管理/约束理论Constraints Management/Theory of Constraints (TOC)
约束理论Theory of Constraints (TOC)
在制品Work in Process
#p#副标题#e#
在制品库存In Process Inventory
直接增减库存处理法Direct-deduct Inventory Transaction Processing
制造周期时间Manufacturing Cycle Time
制造资源计划Manufacturing Resource Planning (MRP II)
重排假设Rescheduling Assumption
重生成式MRP Regenerated MRP
周期盘点Cycle Counting
主生产计划Master Production Schedule (MPS)
装配Assembly
装配订单Assembly Order
装配零件表Assembly Parts List
状况代码Status Code
准时制生产Just-in-time (JIT)
资源需求计划Resource Requirements Planning
总装提前期Final Assembly Lead Time
最后运输日期Last Shipment Date
作废日期Date Obsolete